Thank you for choosing ABB and ReliaMod™ for your modular metering needs. Utility approvals are continuously being released nationwide to ensure no gaps, and some areas are in process and not finalized. Please confirm your utility is listed before quoting. Thank you for your diligence, and we look forward to collaborating with you. Please check back frequently as we continue to gain approvals.
Note: Not all U.S. utilities are listed on this website. This website is intended for the major U.S. utilities, and often, smaller utilities will follow guidelines by larger utilities. Confirm product compliance with your local utility before quoting.
Approved Utilitiesas of 08/27/2024 |
Status |
---|---|
AEP (American Electric Power) | Approved |
AES (Indiana) | Meet |
AES (Ohio) | Meet |
Alabama Power2 | Approved |
Alliant Energy | Approved |
Ameren | Approved |
Arizona Public Service (APS)3 | Meet |
Atlantic City Electric (ACE)4 | Approved |
Austin Energy | Meet |
Baldwin EMC | Meet |
BGE (Baltimore Gas and Electric)4 | Approved |
Bryan Texas Utilities | Meet |
Burbank Water and Power3 | Meet |
City of Banning Electric Utility3 | Meet |
City of Tallahassee | Approved |
City of Vernon Public Utilities (VPU)3 | Meet |
City Public Service of San Antonio (CPS Energy) | Meet |
Clay Electric Cooperative (Florida) | Meet |
Coast Electric | Meet |
Commonwealth Edison (ComEd) | Approved |
Colorado Springs Utilities (CSU) | Meet |
Cuivre River Electric Cooperative | Meet |
Delmarva Power4 | Approved |
Denton Municipal Electric (DME) | Meet |
Duke Energy1 | Approved |
Duquesne Light | Meet |
Entergy | Meet |
EUSERC | Meet |
Eversource (Eastern MA) | Meet |
First Energy | Meet |
Florida Power and Light1 | Approved |
Gainesville Regional Utilities (GRU) | Meet |
Georgia Power2 | Approved |
Green Mountain Power (GMP) | Meet |
Gulf Power1 | Approved |
Gunnison County Electric Association | Meet |
Huntsville Utilities | Meet |
Idaho Power3 | Meet |
Jacksonville Electric Authority (JEA) | Meet |
Jersey Central Power & Light5 | Meet |
Kentucky Utilities (KU) | Meet |
Lincoln Electric System (LES) | Meet |
Louisville Gas & Electric (LG&E) | Meet |
Madison Gas & Electric (MGE) | Meet |
MEG (Meter Equipment Group) | Approved |
Met-Ed5 | Meet |
MidAmerican Energy Company | Approved |
Mississippi Power2 | Approved |
Mon Power5 | Meet |
Nashville Electric Service (NES) | Approved |
National Grid | Meet |
Northern Virginia Electric Cooperative (NOVEC) | Meet |
NV Energy3 | Approved |
Ohio Edison5 | Meet |
Oklahoma Electric Cooperative (OEC) | Meet |
Oklahoma Gas and Electric1 | Approved |
Omaha Public Power District (OPPD) | Meet |
Oncor | Meet |
Orlando Utilities Commission (OUC) | Meet |
Pacific Power1 | Approved |
PacifiCorp3 | Approved |
PECO4 | Approved |
Pedernales Electric Cooperative (PEC) | Meet |
Penelec5 | Meet |
Penn Power5 | Meet |
Portland General Electric3 | Meet |
Potomac Edison5 | Meet |
Potomac Electric Power Company (PEPCO)4 | Approved |
PSE&G (Long Island) | Approved |
PSE&G (New Jersey) | Meet |
Public Service Company of New Mexico (PNM) | Approved |
Puget Sound Energy (PSE)3 | Meet |
Riverside Public Utilities3 | Meet |
Rocky Mountain Power1 | Approved |
Sacramento Municipal Utility District (SMUD)3 | Meet |
San Diego Gas & Electric (SDGE)3 | Meet |
Seattle City Light3 | Meet |
Silicon Valley Power3 | Meet |
Southern California Edison (SCE)3 | Approved |
Southern Company | Approved |
Tampa Electric (TECO)1 | Approved |
The Illuminating Company5 | Meet |
Toledo Edison5 | Meet |
Truckee Donner Public Utility District3 | Meet |
We Energies | Approved |
West Penn Power5 | Meet |
Wisconsin Public Service | Approved |
1 = MEG (Meter Equipment Group) |
Approved: Approved utilities that have a known published or unpublished (internal) approval list that governs their acceptance of the product line on their electrical systems. Meet: Product line meets utility’s specification. A review/pre-approval with the utility or an ABB review of the spec has occurred. However, there is no known published approval list and these utilities may officially accept on a project case-by-case basis. Confirm product compliance with your local utility before quoting. |