Title Sort descending | Date | Size | Publication Number |
---|---|---|---|
Date: | Size: 659808 | Publication Number: 9AKK107045A3421 | |
Date: | Size: 659808 | Publication Number: 9AKK107045A9425 | |
White Paper. Why 1 Percent Energy Efficiency Matters in Data Centers: Using Total Cost of Ownership (TCO) for Power Equipment Purchases can Save Millions of Dollars. Writer: Harry Handlin |
Date: | Size: 462005 | Publication Number: DEE-641 |
12 pages. This article concentrates on circuits/systems 1000V and greater and provides the reader with some general guidelines for the appropriate selection and application of lightning/surge arresters. |
Date: | Size: 999813 | Publication Number: Arresters |
3 pages. The goal of this article is to give the reader a basic understanding of what occurs during an arc flash incident, and an understanding of some of the terms used in qualifying the danger associated with such events. |
Date: | Size: 208362 | Publication Number: ArcFlash4 |
White Paper - A complete failure of utility power is a normal occurrence. A company's power supply may be |
Date: | Size: 675871 | Publication Number: THE-DIGI-WRLD |
Balancing Total Cost of Ownership with Real Estate Demands |
Date: | Size: 467850 | Publication Number: CPWP-EFFCHAL |
SafeT Panel White Paper / Technical Paper |
Date: | Size: 356663 | Publication Number: 1SXU000538G0201 |
How to reduce your OpEx while achieving sustainability |
Date: | Size: 7430026 | Publication Number: 9AKK108466A4092 |
IEEE white paper by Harshavardhan Karandikar, Terry Neighbours and Ron Pate |
Date: | Size: 568185 | Publication Number: 9AKK107992A5637 |
White Paper. The Retrofit Case for Upgrading Legacy Power Systems at Telecom Central Offices. Writer: Paul D. Smith |
Date: | Size: 1707184 | Publication Number: DET-829 |
The authors explore a protection and control architecture based on a single processor that provides all the protection and control functions for a line up of low-voltage switchgear. They demonstrate how this changes the paradigm from individual circuit protection to system protection, while cost-effectively and significantly increasing system reliability and protection. |
Date: | Size: 879181 | Publication Number: DER-036 |
7 pages. GE conducted a survey of industry professionals working in facilities related to the oil and gas industry, pulp and paper industry, and power generation. The study results revealed what we called the problematic three As of arc flash. |
Date: | Size: 190786 | Publication Number: ArcFlash2 |
The behavior of transformer Y connections |
Date: | Size: 4062402 | Publication Number: GET-3388B |
Date: | Size: 388453 | Publication Number: 9AKK107680A6024 | |
Date: | Size: 313851 | Publication Number: 7TAG054970R0000 | |
Date: | Size: 918442 | Publication Number: 9AKK107492A4382 | |
Date: | Size: 712398 | Publication Number: 7TKK000548 | |
Date: | Size: 530727 | Publication Number: 1TQC203900E0003 | |
8 pages. This document outlines: the overview of code changes in NEC Article 409; the overview of UL508A Supplement SB; how short circuit current rating(SCCR) is determined; and process flow charts. |
Date: | Size: 210835 | Publication Number: UL508A |
This paper defines the testing required to qualify specific UPS modules for installation in electrical systems with high available fault currents, using the criteria defined in UL 891 and UL 924 (as described in the July 5, 2000 Bulletin), and the results of specific testing on large General Electric UPS equipment. |
Date: | Size: 4713390 | Publication Number: DET694 |
UPS topologies for Large Critical power systems greater than 500kVA - White Paper |
Date: | Size: 375535 | Publication Number: UPS-TOPOLOGIES |
Date: | Size: 250147 | Publication Number: 9AKK108466A7171 | |
Date: | Size: 487217 | Publication Number: 9AKK107045A3408 | |
Date: | Size: 466765 | Publication Number: 9AKK107045A9422 |
White Papers (199)