White Papers (411)
Title Sort descending | Format | Date | ID |
---|---|---|---|
131.03 KB |
Format: PDF | Date: | ID: 7TKK000085 |
Industry: Electrical utility, Challenge: Enable spiking without cutting feeder cable, Product: Elastimold 600 amp spiking-T-elbow 130 KB |
Format: PDF | Date: | ID: 7TKK000087 |
The Elastimold advanced shear bolt connection system provides a highly reliable solution for 600 A and 900 A elbow connectors that helps reduce the likelihood of installation error with the shear bolt connector's range-taking capability. 227.73 KB |
Format: PDF | Date: | ID: 7TKK001380 |
In this case study see how a large Midwest municipal utility company enhanced its vault equipment while increase environmental sustainability and safety 651.46 KB |
Format: PDF | Date: | ID: 9AKK108467A6852 |
Elastimold molded vacuum interrupters (MVs) provide a dead-front and shielded solution that does not rely on oil, gas or air for insulation or interruption, resulting in long-life, maintenance-free operation. 459.28 KB |
Format: PDF | Date: | ID: 7TKK000015 |
128.98 KB |
Format: PDF | Date: | ID: 7TKK0001208 |
128.98 KB |
Format: PDF | Date: | ID: 7TKK001208 |
Elastimold switchgear and Yampa Valley Electric Association work together to redesign the system to enhance safety, reliability and redundancy and incorporate provisions for future expansion and ease of component replacement. 441.69 KB |
Format: PDF | Date: | ID: 7TKK001414 |
A Midwest municipal utility improves the safety and reliability of its distribution system while also reducing maintenance by replacing oil-insulated switchgear with Elastimold solid-dielectric switchgear. 895.85 KB |
Format: PDF | Date: | ID: 7TKK001576 |
268.7 KB |
Format: PDF | Date: | ID: 7TKK000493 |
576.25 KB |
Format: PDF | Date: | ID: 7TKK000493 |
Learn how FirstEnergy replaced their SF6 switchgear to address environmental concerns and reduce maintenance. 1.4 MB |
Format: PDF | Date: | ID: 7TKK001578 |
In today's working environments, safety is everyone's responsibility. ABB's Elastimold engineers fully understand the importance of safety, and the Elastimold Tru-Break module is the one way to help ensure the safety of electrical crews. 482.69 KB |
Format: PDF | Date: | ID: 7TKK001387 |
ELDS Service - Sustainable Services 491.59 KB |
Format: PDF | Date: | ID: 9AKK107992A7082 |
As the world moves towards reducing carbon emissions, the need for a robust electric vehicle charging infrastructure has become increasingly important. From public charging stations to fast-charging corridors along highways, this infrastructure is transforming the way we travel and helping to minimize environmental impacts.
Explore how ABB can help you design an efficient and reliable Electric Vehicle Charging Infrastructure (EVCI). 4.63 MB |
Format: PDF | Date: | ID: 9AKK108468A6297 |
964.85 KB |
Format: PDF | Date: | ID: 9AKK107680A2698 |
ABB’s embedded ATS system makes it easy to monitor, control and communicate in power networks 4.78 MB |
Format: PDF | Date: | ID: 9AKK107046A2104 |
Next generation electrification solutions, from substation to the point of consumption. 18.31 MB |
Format: PDF | Date: | ID: 9AKK107045A6459 |
744.44 KB |
Format: PDF | Date: | ID: 9AKK107680A7127 |
165.59 KB |
Format: PDF | Date: | ID: 9AKK107680A4289 |
768.48 KB |
Format: PDF | Date: | ID: 9AKK107680A4290 |
299.91 KB |
Format: PDF | Date: | ID: 9AKK107680A6024 |
12.9 MB |
Format: PDF | Date: | ID: 9AKK108470A2062 |
Energy transition and impact on US utility markets 2.11 MB |
Format: PDF | Date: | ID: 9AKK108466A7172 |
This whitepaper will explore the intricacies of achieving optimal TCO in critical power infrastructure, and examine the strategies that organisations can employ to meet operational needs while reducing costs and minimising environmental impact. 2.71 MB |
Format: PDF | Date: | ID: 9AKK108468A6532 |